December 17, 1999
PHARMCHEM LABORATORIES, INC.
Solicitation No. 335660-99-A-0066
DIGEST Protest of evaluation of offeror's sample drug testing devices is denied. Speculative suggestions of circumstances which may have lead to devices' failures to pass test are insufficient to support its objections to the tests; objections to use of testing firm is untimely raised; firm's previous competitive involvement with offeror does not warrant discrediting firm's description of videotape record as immaterial to offeror's theory of testing improprieties. |
Decision
The Purchasing and Materials Service Center, New York Metro Area, issued solicitation 335660-99-A-0066 for on-site urinalysis testing devices and related items and services. The testing device was provide a positive reaction to the following drugs at specified cut-off levels:
Amphetamines
Cocaine metabolites
Marijuana metabolites
Morphine/opiate metabolites
Phencyclidine (PCP)
Award was to be made on the basis of price and various specified proposal- and supplier-specific evaluation factors.1 One of the pass/fail factors was whether the testing devices (of which 40 were to be supplied with each proposal) demonstrated the required ability to identify the specified drugs. According to the contracting officer’s report, "[a]ll offerors were made aware through a telephone call from the contracting officer after receipt of their proposal[s] that [an independent testing laboratory,] NWT [Inc.,] would be conducting the independent reliability study and that the Postal Service would provide the offeror an opportunity to meet with [NWT’s] laboratory personnel to provide any additional information which they felt might be helpful in evaluating their device."2
PharmChem protests the evaluation of the devices which it offered as failing to detect THC (a marijuana metabolite) in five of the six devices tested against control samples "spiked" with THC at a level of 150% of its device’s screening cutoff, asserting that it and the manufacturer ran similar tests on devices from the lot which it submitted with positive results in each case. The protester concludes, in light of these test results, that NWT’s "test procedures were somehow flawed," and suggests that NWT had a "serious conflict of interest" because Roche Diagnostics Corporation (Roche) the eventual awardee at a price higher than that offered by PharmChem, was "a principle client" of NWT. The protest seeks the re-evaluation of its product, and the adjustment of its technical score.3
The contracting officer’s statement in response to the protest defended the rigor of the testing procedure and asserted that the procedure was "carefully followed." It also defends NWT’s "established reputation for independence, integrity, and competence." The statement discloses that the evaluators were aware, when NWT was selected, that NWT had sold "a small quantity of on-site testing devices manufactured by Roche (approx. 1000 devices)," but that the Postal Service "determined that this activity was insignificant in the context of a multi[-]million dollar corporation and could in no way constitute a conflict of interest." The statement further notes that NWT did not stand to gain from the award to any offeror.
The copy of the contracting officer’s statement furnished to PharmChem was not accompanied by documentation concerning the testing. In response to PharmChem’s requests for documentation, the contracting officer undertook to provide it. In the course of doing so, the contracting officer advised that although "a photographic record was never requested by the original protocol contracted for," NWT produced photographic data in the form of a digital videotape "on an informal, trial basis," that NWT advised that "the images were not intended to and do not present an accurate representation of the results . . ." that the videotape would required duplication to segregate PharmChem’s results from the other results, and that such a "second generation copy would be even less representational [than the original]."
The contracting officer subsequently provided an affidavit of NWT’s president which amplified these issues. Noting that PharmChem and other representatives had explained to NWT that their devices demonstrated negative results by the appearance of colored lines (in PharmChem’s case, "[a] line . . . of any shade of pink [that] may be weaker or stronger than . . . the control line") she asserted that the "tape [was] to provide an informal record that the testing was performed using the kits provided and that each kit had been assigned a unique laboratory accession number that corresponded to the number on the result report sheet." Because of that limited purpose, NWT "did not verify if the various . . . lines . . . would in fact be discernable to the viewer of the tape." Subsequently, at the Postal Service’s request, NWT had the tape reviewed, and the reviewer concluded "that while certain colors, shades and lines were visible, the digital video image did not include the resolution or color reproduction required to discern certain hues and narrow faint lines." NWT did not furnish the tape to the contracting officer.
PharmChem made the following points in response to the contracting officer’s statement:
Roche submitted comments on the contracting officer’s statement as follows:
Roche also submitted comments on PharmChem’s response to the contracting officer’s statement:
PharmChem submitted additional comments which restated several of its previous points:
The contracting officer submitted a final rebuttal to PharmChem’s submission which made the following points:
Discussion
As the contracting officer and interested party Roche have noted, our review of the merits of technical evaluations is limited:
[W]e will not substitute our views for the considered judgment of technical personnel upon which such a determination is premised in the absence of fraud, prejudice, or arbitrary and capricious action
The protester bears the burden of proving its case affirmatively. This burden must take into account the "presumption of correctness" which accompanies the statements of the contracting officer, and if such allegations do not overcome the presumption of correctness, we will not overturn the contracting officer's position.
Timeplex Federal Systems, Inc., Sprint Communications Company, P.S. Protest Nos. 93-22; 93-24, February 2, 1994, citations omitted.
Although PharmChem offers suggestions of scenarios which may have lead to its devices’ failures to pass the required test, those suggestions are not accompanied by any affirmative evidence that the suggested circumstances occurred. Its unsupported speculations thus are insufficient to support its burden. Canteen Corporation, P.S. Protest No. 92-37, October 28, 1992.
That NWT has declined to furnish the videotape which it made in the course of testing the samples does not support the protester’s case. It is clear from NWT’s description of the videotape’s purpose ("an informal record that the testing was performed using the kits provided and that each kit had been assigned a unique laboratory accession number") that it would shed little light on the circumstances which the protester suggests lead to its devices’ failures in the tests (errors in labeling or dividing the samples with which the tests were to be performed).
To the extent that PharmChem’s protest objects to the use of NWT to evaluate the offered devices, it is untimely since it came more than ten days after PharmChem was aware of both the intention to use NWT and the basis for its objections to it. PM 3.6.4.d. The objection on the basis of its previous sale of Roche products is, in any event, without merit. Cf. TAD Trucking Company., Comp. Gen. Dec. B-230211.3, August 12, 1988, 88-2 CPD ¶ 141 (offeror’s previous, completed "conventional commercial transaction" with government contractor does not create organizational conflict of interest) and Teledyne-Commodore, LLC, Comp. Gen. Dec. B-278408.5, March 8, 1999, 99-1 CPD ¶ 60 (no appearance of conflict of interest where evaluating firm could gain no financial benefit from outcome of its evaluation). Similarly, NWT’s prior competitive relationship with PharmChem such as in the Army procurement discussed above does not provide a basis to question NWT’s description the videotape.
The protest is denied.
William J. Jones
Senior Counsel
Contract Protests and Policies
1Provision 4-2, Evaluation – Commercial Items, as included in the solicitation provided eight proposal-specific evaluation criteria worth a total of 100 points and two proposal-specific criteria scored pass/fail, five supplier-specific evaluation criteria to which points were not assigned, and provided that "[p]roposal[-] specific and supplier[-]specific performance evaluation factors, when combined, are more important than price."
2The test report was prepared by NWT Drug Testing, a division of NWT, for Bensinger Dupont & Associates, a postal consultant for the purchase.
3Dade Behring, another offeror on the solicitation, submitted a separate protest which was subsequently withdrawn. PharmChem submitted comments on that protest as an interested party.
4Roche’s comments also addressed issues presented in the Dade Behring protest which need not be restated here.
5Documentation accompanying the submission indicates that the GAO protest was ongoing in the fall of 1998. A decision subsequently issued as NWT, Inc.; PharmChem Laboratories, Inc., Comp. Gen. Dec. B-280988, B-290988.2, December 17, 1998, 98-2 CPD ¶ 158. NWT and PharmChem had both offered to provide drug testing services for the Army National Guard and the Coast Guard, but the Department of the Army, the purchasing agency, decided instead to perform the services in-house at a laboratory at the Tripler Army Medical Center on the basis of a cost comparison to PharmChem’s offer, which had been evaluated as most advantageous. NWT and PharmChem protested the cost comparison, and NWT also protested elements of the technical evaluation of its offer and PharmChem’s offer. The GAO’s decision found no basis to object to the Army’s evaluation of the offers, or to the comparison the in-house costs to PharmChem’s costs.
6Contrary to this contention, the record which the contracting officer has submitted is not sufficiently detailed to establish that Roche’s offer would have been entitled to the award had PharmChem’s offer not been eliminated.